Full description:

This modern dwelling was built using high end finishing materials on a prime location on Aruba. Various materials were used for this prestigious project. In combination with a complex design this created major challenges for Albo’s execution team as each material has its own characteristics.

PROJECT SPECIFICATIONS
Project:
Private Residence Malmok
Principal:
Private owner
Design:
Gary Osterman (U.S.A.)
Civil Engineer:
HJC Engineering (Aruba)
Contract sum in US$:
-
Construction period:
April 2012 – August 2014