Quay Wall Harbor Barcadera

The renewal and extension of the quay wall at the Barcadera port is part of a comprehensive plan to move Aruba's container terminal from its current location at the Paardenbaai area to Barcadera. This was initiated to start new touristic developments of the former harbor and free zone area, which is in Oranjestad. The Barcadera area is [...]

ECO TECH RECYCLING PLANT

This 8,000 m2 industrial building houses several recycling installations. A steel structure and steel wall and roof cladding were used to erect the building. PROJECT SPECIFICATIONS Project: ECO-Tech Recycling Plant, Barcadera Principal: Ecological Technologies Trading Free Zone N.V. Design: HJC Engineering / RHK / PIB (Aruba) Civil Engineer: HJC Engineering Contract sum in US$: 3,222,222 Construction period: [...]

TRAFO-YARD

This building was created to supply storage space for some transformers. The major challenge was to create a building with sufficient ventilation. As you can see, the solution was found by using prefabricated 'perforated' concrete panels. PROJECT SPECIFICATIONS Project: TRAFO-YARD, PALM BEACH Principal: Elmar N.V. Design: HJC Engineering (Aruba Civil Engineer: HJC Engineering (Aruba Contract [...]

ELECTRICITY SUBSTATION

PROJECT SPECIFICATIONS Project: Electricity Substation, Sabana Blanco Principal: Elmar Design: N/A Civil Engineer: HJC Engineering (Aruba) Contract sum in US$: 344,880 Construction period: June - October 2012