This building was created to supply storage space for some transformers.

The major challenge was to create a building with sufficient ventilation. As you can see, the solution was found by using prefabricated ‘perforated’ concrete panels.

PROJECT SPECIFICATIONS
Project:
TRAFO-YARD, PALM BEACH
Principal:
Elmar N.V.
Design:
HJC Engineering (Aruba
Civil Engineer:
HJC Engineering (Aruba
Contract sum in US$:
181,100
Construction period:
February 2013 – March 2013